Process comparison

DOM vs ERW tubing

DOM is ERW tubing that receives subsequent drawing. The useful comparison is drawn versus as-welded processing, not seamless versus welded.

Edition ASTM A513/A513M-25Succession MFG editorial teamUpdated
On this page

The short answer

The comparison is mislabeled from the start: DOM is ERW tubing. Every DOM tube began on an ERW mill; the difference is the cold-drawing operation afterward. So the real question is whether your part needs what the draw adds — tighter OD/ID/wall relationships, refined surfaces, a worked weld zone, and increased strength from cold work — enough to pay for it.

As-welded ERW is the right answer more often than catalogs suggest: welded frames, brackets, rollers, sleeves with generous fits, and painted or powder-coated products rarely benefit from drawn product.

Tradeoffs

Drawing can improve dimensional relationships and surface while adding conversion cost and potentially changing mechanical response. As-welded tubing may be the efficient choice when its capability meets the part drawing.

Qualitative comparison of as-welded ERW and DOM
AspectAs-welded ERW (Types 1–2)DOM (Type 5)
Dimensional relationshipsStandard limits by type/sizeTightest in the A513 family
Surface finishFollows strip and mill practiceRefined by drawing
Weld zoneAs welded (flash options vary)Cold worked and typically blended
StrengthAs-welded conditionRaised by cold work (condition-dependent)
Relative costLowerHigher
Typical fitFrames, fabrications, coated partsMachined, sliding, sealing parts

A practical decision test

Ask three questions. Does a machined feature, sliding fit, or seal depend on the tube's OD/ID relationship? Does machining stock or setup scrap on as-welded tube exceed the DOM price premium? Does the weld bead interfere with anything inside the tube? If all three answers are no, as-welded ERW deserves the quote.