Independent educational resource — not affiliated with ASTM International.Purchase the official standard

Comparison hub

Tubing comparisons, in one place

Every tubing comparison on this site, organized by the decision you are actually making: which specification governs, which manufacturing route fits, and what the shop nicknames really mean.

Edition ASTM A513/A513M-25Succession MFG editorial teamUpdated
On this page

The short answer

Tubing comparisons go wrong when they mix categories. “A513 vs A500” is a specification-intent question (mechanical component versus structural member). “DOM vs ERW” is a processing question inside one specification (drawn versus as-welded). “HREW vs CREW” is a starting-material question expressed in trade slang. Decide which kind of question you are asking first, then use the matching comparison page.

If you are unsure where to start: parts that carry structural loads under a design code point to the A513-vs-A500 page; parts that are machined, sealed, or slid over other parts point to the DOM-vs-ERW page; and legacy drawings written in nicknames point to the HREW-vs-CREW page.

Which comparison answers which question

The table below positions the three most-confused products by design intent rather than by nominal size. It is qualitative orientation, not a substitute for the governing standard or engineering review.

Positioning of commonly confused tubing products
Product / specCategory of questionTypical governing concernStart here
ASTM A513 (Types 1–2)Specification + routeFabrication, fit, costDOM vs ERW
ASTM A513 Type 5 (DOM)Route inside A513Machining stock, OD/ID relationshipType 5 DOM guide
ASTM A500Specification intentStructural minimums, code referenceA513 vs A500
ASTM A519 (seamless)Specification + routeNo weld zone, alloy rangeA513 vs A519
HREW / CREW (slang)Starting materialSurface, strip control, PO languageHREW vs CREW

How these comparisons are written

Each comparison page opens with a direct answer, then explains the process reasoning behind it, then lists the specification mistakes we actually see on drawings and purchase orders. None of them reproduce normative ASTM values; all of them assume the purchased standard and the supplier agreement govern acceptance.

A two-minute triage

Ask three questions about the part. Does a design code or structural calculation reference it? If yes, resolve the A500 question before anything else. Will the tube be machined, sealed, or fitted to another component? If yes, weigh the drawn routes. Is the requirement written in a nickname? If yes, translate it to a type designation before requesting quotes.

Sources and limitations

These sources inform the qualitative guidance on this page. This publication does not reproduce their text, tables, numerical settings, or acceptance criteria. Normative requirements come only from the purchased current edition of the governing standard and your supplier agreement.

Related reading

Steel Tubing Comparisons: A513, A500, DOM, ERW