Manufacturing & troubleshooting

Scrap reduction in tube production

Quantify loss by reason, stage, material, order, and time before prioritizing safe improvement work.

Edition ASTM A513/A513M-25Succession MFG editorial teamUpdated
Tube-mill investigation must follow site lockout/tagout, guarding, stored-energy, electrical, pinch-point, hot-work, and qualified-person procedures. Never inspect, measure, or adjust moving equipment.

Make scrap visible

Separate startup, trim, cutoff, dimensional, surface, weld, handling, and documentation losses. Weight, footage, pieces, and net material cost answer different questions.

  • Use consistent reason codes
  • Protect containment and quality gates
  • Prioritize recurring verified loss
  • Confirm savings after implementation